What kind of limestone crushing equipment is commonly used?
Limestone component is more complex, belongs to the medium hardness rock, Mohs hardness is not higher than 3, the nature of the brittle, according to the material qualities, crushing limestone with what crusher good? Commonly used jaw crusher, impact crusher, hammer crusher and other equipment, is very popular, that is, to meet the industry standards, but also in line with customer demand.
1. Jaw Crusher
Generally used for primary crushing, using extrusion crushing principle, its crushing cavity depth (V-shaped), and no dead zone, enhance the throughput, the use of oversized bearings and forged spindle, bearing crushing force is greater, coupled with the design of the flywheel, effectively reduce the vibration, smoother operation, and hydraulic design, reliable performance, low failure rate, the discharge port gasket adjustment, the finished product specifications.
2.Impact crusher
Generally used in the second crushing process, the use of impact to crush materials, repeated impact between the plate hammer and impact plate for crushing, new structural design, machine rigidity, the rotor has a large moment of inertia, the finished limestone grain shape is good, cubic, no tension and cracks, the overall efficiency.
3. Hammer Crusher
It is suitable for medium hardness and brittle materials, relying on the impact of the hammer to break the material, modular design, by replacing the cavity type, you can realize the conversion of coarse, medium and fine crushing, eliminating the primary crushing process, and no longer need a secondary crushing and shaping process, less powder phenomenon, improve the production efficiency, and reduce the investment cost.
Limestone crushing production line process and configuration proposal
Limestone processing into stone, generally speaking, need to carry out coarse crushing, medium and fine crushing, screening and other processes, but also to consider the size of raw materials, production demand, budget, finished product, site, etc. In addition, before processing limestone, the owner has to apply for the relevant legal formalities, to choose the appropriate plant site, while meeting the transportation and water and electricity convenience conditions, the construction of infrastructure, cement platforms, etc., to complete the design of limestone production line Proposal.
Leave a Reply